The license holder, Slovenské elektrárne, a. s., (SE, a. s.) performed a periodic nuclear safety assessment for the NPP Jaslovské Bohunice Units 3 & 4 (hereinafter only as "V2 NPP"). A periodic assessment was performed for the state of nuclear power plant as at 26 August 2016, i.e. as at the date stipulated in the UJD SR Decision No. 275/2008 and was completed on 30 August 2017. Subsequently UJD SR performed the review of the periodic assessment.



The report "The review of the periodic assessment of V2 NPP" documents the results of the UJD SR review of the periodic assessment conducted by SE, a. s. UJD SR reviewed the results of the periodic assessment including the integrated plan for the implementation of proposed corrective actions and safety improvements to remove identified negative findings. The review, carried out within the framework of the UJD SR inspection No. 206/2017, was aimed at veryfiyng compliance of the results of periodic assessment with the actual status and requirements of generally binding legal regulations of the Slovak Republic, the Western European Nuclear Regulators Association (WENRA) reference levels, the International Atomivc Energy Agency (IAEA) safety standards and the good practice.

Modified: 13.2.2019 16:16