6.1.2 TECHNICAL AND ECONOMIC PARAMETERS


This section presents some technical and economic parameters of NPP Bohunice and NPP Mochovce in operation.

UNIT CAPABILITY FACTOR

Unit Capability Factor - UCF is a WANO parameter that expresses the percentage ratio of electricity actually generated on unit and energy the unit would be able to generate within the given time interval, accounting for external limiting influences (power regulation by control center, etc.). The lower coefficient values for unit 1 and 2 were due to extended overhauls to implement safety improvements - in 1996 through 2000 (see diagram 6.1.2.a.) and table 6.1.2.b.). Note: Unit 1 at Mochovce was on trial operation in 1998 and was actually only operated during approximately a single quarter.

LOAD FACTOR - COEFFICIENT OF UTILISATION


The load factor accounts for the actual supplies of electricity in relation with electricity supplies to the grid that are possible, with not accounting for external limiting factors (power regulation by control center etc.). The lower values of the load factor of the Bohunice units achieved were significantly influenced by control center requirements on power regulation and extended overhauls under the Gradual upgrading of NPP V-1 units (see diagram 6.1.2.c.) and table 6.1.2.d.).

a612.jpg (38839 bytes)

Fig.:6.1.2a.)

 

 

1994

1995

1996

1997

1998

1999

2000

NPP V-1 U1

86.59

85.82

80.23

75.50

66.13

86.38

59.53

NPP V-1 U2

80.70

84.46

74.60

65.0

54.59

68.27

76.31

NPP V-2 U3

84.67

77.07

85.52

88.0

85.46

76.67

88.13

NPP V-2 U4

83.85

87.52

79.15

85.3

85.79

81.67

76.32

NPP Mochovce U1

 

 

 

 

99.6

71.03

89.55

Table 6.1.2b.)

a612c.jpg (44027 bytes)

Fig. 6.1.2c.)

 

1994

1995

1996

1997

1998

1999

2000

NPP V-1 U1

0.798

0.770

0.682

0.623

0.584

0.635

0.544

NPP V-1 U2

0.773

0.780

0.699

0.599

0.515

0.637

0.705

NPP V- 2 U3

0.785

0.668

0.787

0.802

0.785

0.691

0.783

NPP V- 2 U4

0.781

0.730

0.734

0.765

0.790

0.743

0.679

NPP Mochovce   U1

 

 

 

 

0.944

0.670

0.792

NPP

Mochovce   U2

 

 

 

 

 

 

0.723

Table 6.1.2d.)

ELECTRICITY GENERATION

NPP Bohunice units generated in 2000 a total of 10 546 884 MWh, representing a slight increase compared to 1999 (10 513 827 MWh). NPP Mochovce generated a total of 5 946 691 MWh electric energy (see diagrams 6.1.2.e.) and 6.1.2.f.).


a612e_f.jpg (36686 bytes)

        Fig. 6.1.2e.)                                                                                  Fig. 6.1.2f.)

NI of SE-VYZ PARAMETERS FOR 2000

No.

 

Parameter

Unit

Is

1.

Processing lines

 

 

a)

volume of NPP V-1 concentrate processed

m3

120

b)

volume of NPP A-1 concentrate processed

m3

0

c)

volume of chrompik processed

m3

3

 

2.

BSC RAW

 

 

a)

pressing

t

37.1

b)

cementing

m3

28.,5

c)

incineration – solid RAW

t

10.3

d)

FCC production

pcs

35

 

3.

Quantities of spent fuel stored

 

 

a)

 WWER fuel

pcs

5 382

b)      

 A-1 fuel

pcs

0