6.1.2 TECHNICAL AND
ECONOMIC PARAMETERS
This section
presents some technical and economic parameters of NPP Bohunice and NPP Mochovce in
operation.
UNIT CAPABILITY FACTOR
Unit Capability Factor - UCF is a WANO parameter that expresses the percentage ratio of
electricity actually generated on unit and energy the unit would be able to generate
within the given time interval, accounting for external limiting influences (power
regulation by control center, etc.). The lower coefficient values for unit 1 and 2 were
due to extended overhauls to implement safety improvements - in 1996 through 2000 (see
diagram 6.1.2.a.) and table 6.1.2.b.). Note: Unit 1 at Mochovce was on trial operation in
1998 and was actually only operated during approximately a single quarter.
LOAD FACTOR - COEFFICIENT OF UTILISATION
The load factor accounts for the actual supplies of electricity in relation with
electricity supplies to the grid that are possible, with not accounting for external
limiting factors (power regulation by control center etc.). The lower values of the load
factor of the Bohunice units achieved were significantly influenced by control center
requirements on power regulation and extended overhauls under the Gradual upgrading of NPP
V-1 units (see diagram 6.1.2.c.) and table 6.1.2.d.).

Fig.:6.1.2a.)
|
1994 |
1995 |
1996 |
1997 |
1998 |
1999 |
2000 |
NPP V-1 U1 |
86.59 |
85.82 |
80.23 |
75.50 |
66.13 |
86.38 |
59.53 |
NPP V-1 U2 |
80.70 |
84.46 |
74.60 |
65.0 |
54.59 |
68.27 |
76.31 |
NPP V-2 U3 |
84.67 |
77.07 |
85.52 |
88.0 |
85.46 |
76.67 |
88.13 |
NPP V-2 U4 |
83.85 |
87.52 |
79.15 |
85.3 |
85.79 |
81.67 |
76.32 |
NPP Mochovce U1 |
|
|
|
|
99.6 |
71.03 |
89.55 |
Table 6.1.2b.)

Fig. 6.1.2c.)
|
1994 |
1995 |
1996 |
1997 |
1998 |
1999 |
2000 |
NPP V-1 U1 |
0.798 |
0.770 |
0.682 |
0.623 |
0.584 |
0.635 |
0.544 |
NPP V-1 U2 |
0.773 |
0.780 |
0.699 |
0.599 |
0.515 |
0.637 |
0.705 |
NPP V- 2 U3 |
0.785 |
0.668 |
0.787 |
0.802 |
0.785 |
0.691 |
0.783 |
NPP V- 2 U4 |
0.781 |
0.730 |
0.734 |
0.765 |
0.790 |
0.743 |
0.679 |
NPP Mochovce U1 |
|
|
|
|
0.944 |
0.670 |
0.792 |
NPP
Mochovce U2 |
|
|
|
|
|
|
0.723 |
Table 6.1.2d.)
ELECTRICITY GENERATION
NPP Bohunice units generated in 2000 a total of 10 546 884 MWh,
representing a slight increase compared to 1999 (10 513 827 MWh). NPP Mochovce generated a
total of 5 946 691 MWh electric energy (see diagrams 6.1.2.e.) and
6.1.2.f.).

Fig. 6.1.2e.)
Fig. 6.1.2f.)
NI of SE-VYZ PARAMETERS FOR 2000
No.
|
Parameter |
Unit |
Is |
1. |
Processing lines |
|
|
a) |
volume of
NPP V-1 concentrate processed |
m3 |
120 |
b) |
volume of
NPP A-1 concentrate processed |
m3 |
0 |
c) |
volume of
chrompik processed |
m3 |
3 |
|
2. |
BSC RAW |
|
|
a) |
pressing |
t |
37.1 |
b) |
cementing |
m3 |
28.,5 |
c) |
incineration
– solid RAW |
t |
10.3 |
d) |
FCC
production |
pcs |
35 |
|
3. |
Quantities of spent fuel stored |
|
|
a) |
WWER fuel |
pcs |
5 382 |
b)
|
A-1 fuel |
pcs |
0 |
    
|