5.3.3 Maintenance testing and control documentation for management and operation


See National Report as of September 1998

5.3.3.1 Operating documentation

For the overall description of operating documentation - See National Report as of September 1998

Symptoms-based emergency operating procedures were developed for NPP V-2 and NPP Mochovce in cooperation with Westinghouse Electric Europe, Brussels. The unit control room staff was trained and the procedures were put in place in 1999.

Presently, similar procedures are being drafted for NPP V-1 in cooperation with the same contractor.

5.3.3.2 Documentation for equipment inspections and testing

See National Report as of September 1998

5.3.3.3 Technological and working maintenance procedures

See National Report as of September 1998