5.3.3
Maintenance testing and control documentation for management and operation
See National Report as of September 1998
5.3.3.1 Operating documentation
For the overall description of operating documentation - See National Report as of September 1998
Symptoms-based emergency operating procedures were developed for NPP V-2 and NPP Mochovce
in cooperation with Westinghouse Electric Europe, Brussels. The unit control room staff
was trained and the procedures were put in place in 1999.
Presently, similar procedures are being drafted for NPP V-1 in cooperation with the same
contractor.
5.3.3.2 Documentation for equipment inspections and testing
See National Report as of September 1998
5.3.3.3 Technological and working maintenance procedures
See National Report as of September 1998
    
|