3.6  INSPECTION AND ASSESSMENT ACTIVITIES AT NUCLEAR INSTALLATION:


SE-VYZ, NATIONAL RADIOACTIVE WASTE REPOSITORY IN MOCHOVCE
 

Implementation of modifications required by UJD was practically completed in 1998 (i.e. especially modifications to the drainage system and temporary covering of the repository). At the end of 1998 the operator submitted the safety documentation required by Act No. 130/98 Coll. as an attachment to the application for approval of commissioning of this nuclear installation.

Assessment activity

Assessment activity of UJD was focused on review of repository safety documentation, as well as documentation for safe transport of waste from the Bohunice conditioning center to the repository in Mochovce. With regard to the extensive safety documentation resolution of UJD will be issued in 1999.

Inspection activity

Inspection activity of UJD was concentrated on regular control of activities related to the completion of the repository.

 
 
© Nuclear Regulatory Authority of the Slovak Republic, 1999

WWW DESIGN    © INFELEN, 1999