SE-EBO:
Safety Report for NPP V-1 12/1978
Amended Safety Report for NPP V-1 03/1993
Safety Report for NPP V-2 12/1982
Safety Report for NPP V-2 (After 10 years of Operation) 12/1997
SE-EMO:
Pre-Operation Safety Report for NPP Mochovce 1/1998
SE-VYZ:
Safety Report for NPP A-1: Current Status 11/1997
Pre-Operation Safety Report for ISFS 08/1985
Pre-Operation Safety Report on the Semi-Operation PS 44 on the Bitumen
LineEBO 12/1989
Pre-Operation Safety Report on Chrompik Vitrification 2/1995
Safety Report on RAW Storage 1-10/1997
Pre-Operation BSC Report 6/1998
Safety Report on Institutional RAW Transport - Open Irradiators 2/1995
Safety Report for Transport of Used Closed Radiators 12/1997
Pre-Operation Safety Report on Dowtherm Bitumenation Processing 7/1993
Pre-Operation Safety Report on NPP A-1 Fuel Treatment Facility 2-12/1997
|
WWER RD 004 |
Team's Analyses of Soviet Design WWERs DOE Sept 1989. |
|
|
WWER RD 007 |
(NENS/ASSET 90/4) ASSET Mission to Bohunice (1 - 12 Oct 1990) |
|
|
WWER RD 010 |
(NENS/TEX/90/4) Technical Exchange Visit Bohunice NPP Mission conducted from 3 - 7 Sept 1990 Documentation of Special Safety Measures - CSFR Dec 1990. |
|
|
WWER RD 019 |
Report of the Conceptual Design Review meeting of WWER 440 - 230 NPPs (Feb 4 -15 1991). |
|
|
WWER RD 022 |
Safety Review Mission to Bohunice Report (4-26 April 1991). |
|
|
WWER RD 025 |
Evaluation of the Safety Status of NPP Jaslovské Bohunice V-1 Austrian Expert Commission (July 1991). |
|
|
WWER RD 031 |
Final Report of A Safety Review Mission in Relation to The Design Seismic Upgrading for Bohunice NPP. IAEA, CSFR (2-6 Sept 1991). |
|
|
WWER RD 032 |
Evaluation of the Safety Status of the NPP Jaslovské Bohunice V-1 Report of the Austrian Expert Commission July 1991. (see RD 025) |
|
|
WWER RD 036 |
TECDOC 659 Reactor Pressure Vessel Embrittlement 1992. |
|
|
WWER RD 037 |
Safety of WWER 440/230 NPP`s Safety Issues and Ranking (28 Oct - 1 Nov 1991) TECDOC - 640). |
|
|
WWER RD 038 |
Safety Review Mission in relation to the Follow-up of Seismic Upgrading Works at Bohunice NPP. |
|
|
WWER RD 042 |
Final Report of Seismic Safety Review Mission in relation to the seismic upgrading of Bohunice NPP (5-8 April 1993). |
|
|
WWER RD 043 |
International Peer Review Service for Probabilistic Risk Assessment of the Bohunice V-1 NPP (8-12 March 1993). |
|
|
WWER RD 048 |
Bohunice V-1 Major Safety Upgrading., Piešťany 12-16 July 1993. |
|
|
WWER RD 051 |
Report of the Fire Protection Workshop at Zaporozhe NPP., 9-13 August 1993. |
|
|
WWER RD 053 |
Compilation of Recommendations and Plant programmes for the safety upgrading of WWER 440 model 230 NPP`s. |
|
|
WWER RD 056 |
Report of the CM on the LBB Concept Application to the Jaslovské Bohunice NPP, 28 February to 2 March 1993. |
|
|
WWER RD 061 |
Major Improvements for WWER 440/230 NPP`s (CM 15-19 November 1993). (WWER SC 087) |
|
|
WWER RD 062 |
Safety improvements review guidelines for Mochovce NPP, May 1994. |
|
|
WWER RD 065 |
International peer review service for Level 1 PSA of Bohunice V1 NPP (28 February - 11 March 1994). |
|
|
WWER RD 069 |
Comparison of the Russian NPP safety concept contained in OBP 88 and the next lower levels norms/ rules with the NUSS requirements. |
|
|
WWER RD 072 |
RPV Embrittlement and Annealing for WWER 440/230., CM 10-14 May 1993. Version April 1994 (former WWER SC 081). |
|
|
WWER RD 073 |
Summary report on evaluation and assessment of findings of Asset Missions to WWER 440/213 NPP`s. |
|
|
WWER RD 074 |
Safety Review Mission Report to Mochovce NPP 5-13 May 1994. |
|
|
WWER RD 075 |
Working Material on the workshop on the safety techniques and practices for evaluation and licensing of modifications in nuclear power plants built in accordance with early safety standards, Obninsk, Russia 13-17 June 1994. |
|
|
WWER RD 078 |
Safety review mission to Bohunice V2, 5-16 September 1994. |
|
|
WWER SC 003 |
INSAG report on the IAEA Nuclear Safety Project on WWER 440-230 (Nov 1990). |
|
|
WWER SC 004 |
INSAG List of Safety Significant Issues for WWER 440/230 - (draft - 20/12/90). |
|
|
WWER SC 012 |
Report of the State Regulatory Body of CSFR on Complex Evaluation of NPP Bohunice (INFO to 2nd SCM). |
|
|
WWER SC 015 |
Bohunice Safety Review Mission (4-26 April 91) (Draft Report). (see RD 022) |
|
|
WWER SC 020 |
Generic Study: Status Report prepared by IAEA RPV Embrittlement (26.8.91). |
|
|
WWER SC 023 |
CSFR Programme Leak Before Proposal for application to the NPP Kozloduy, Bulgaria August 1991. |
|
|
WWER SC 035 |
Guidance for Safety Review Mission Follow-up Visits within the WWER-440/230 Project (to Bohunice). |
|
|
WWER SC 038 |
Final Report of the Safety Review Mission follow-up to Bohunice NPP 27-30 April 1992. |
|
|
WWER SC 044 |
Backfitting of the V-1 Bohunice Plant Units 1 and 22 (S. Rohar, V. Tvaroska). |
|
|
WWER SC 045 |
January 1991 - decision of CZAEC No.5/1991 on further operation of NPP V-1. |
|
|
WWER SC 058 |
Decision No. 213/92 from CSAEC. |
|
|
WWER SC 086 |
Design and design basis (Report of TC Project RER/9/004) Reference Unit Bohunice NPP V2, December 1993. |
|
|
WWER SC 087 |
Major Improvements for WWER 40/230 Npps (CM 15-19 November 1993). (WWER RD 061). |
|
|
WWER SC 094 |
Guidelines for Accident Analysis for WWER nuclear power plants. (Draft October 1994. |
|
|
WWER SC 101 |
Confinement improvement Options for NPP`s with WWER 440/230 plants, July 1995. |
|
|
WWER SC 102 |
Safety improvements review mission to Mochovce NPP (19 Nov - 3 Dec 1993). |
|
|
WWER SC 114 |
Report of the Advisory Group Meeting, 13-15 December 1994. |
|
|
WWER SC 127 |
Safety review mission guidelines. |
|
|
WWER SC 129 |
Report of the IPERS for the Bohunice V2 PSA Review Mission, 17-27 January 1995. |
|
|
WWER SC 139 |
Guidelines for WWER 440/213 Containment Evaluation, Vienna, Austria, 13-17 March 1995., 26-30 August 1996. |
|
|
WWER SC 142 |
Review of Bubble Condenser Structural Integrity Calculations, CM 12-16 June 1995, Vienna. |
|
|
WWER SC 146 |
Technical Guidelines for the Seismic Re-evaluation Programme of Mochovce NPP (Unit 1-4), Slovak Republic, August 1995 |
|
|
WWER SC 157 |
Guidelines on the RPV PTS Analysis for WWER NPP`s, 25-29 March 1996, Vienna. |
|
|
WWER SC 159 |
Report of a Consultants Meeting on "Review of Bubble Condenser Structural Integrity in Mochovce and Bohunice NPP`s", November 1995. |
|
|
WWER SC 165 |
Guidelines for Analysis of Accidents During Shutdown Modes of WWER NPP`s, 5-9 February 1996, Vienna. |
|
|
WWER SC 177 |
Overview of other International Programmes |
|
|
WWER SC 180 |
Draft Report of a Technical Visit Organized by the IAEA to Bohunice NPP Units 1 & 2, Slovak Republic, 6-8 May 1996. |
|
|
IAEA-EBP-WWER-01 |
Guidelines for Accident analysis of WWER NPPs (Dec. 1995). |
|
|
IAEA-EBP-WWER-02 |
Technical basis for I&C design improvements in WWER 440/230 NPPs (Jan. 1996). |
|
|
IAEA-EBP-WWER-03 |
Safety issues and their ranking for WWER 440 model 213 NPPs (April 1996). |
|
|
IAEA-EBP-WWER-04 |
Databases on Safety Issues for WWER and RBMK Reactors (April 1996). |
|
|
IAEA-EBP-WWER-05 |
Safety issues and their ranking for WWER 1000 model 320 NPPs (March 1996). |
|
|
IAEA-EBP-WWER-06 |
WWER-440/230 Reactors Pressure Vessel Integrity (August 1996). |
|
|
IAEA-EBP-WWER-07 |
WWER-1000 Steam Generator Integrity (former WWER-SC-176) (July 1997). |
|
|
IAEA-EBP-WWER-08 |
Guidelines on the PTS Analysis for WWER NPPs (August 1996) (former WWER-SC-157) (April 1997). |
|
|
IAEA-EBP-WWER-09 |
Procedures for Analysis of Accidents in Shutdown Modes for WWER NPPs (July 1997) (former WWER-SC-165). |
|
|
IAEA-EBP-WWER-10 |
Review of the Methods Used for Leak Rate Measurements for WWER-440/230 Confinements and WWER-440/213 Containments. |
|
|
IAEA-EBP-WWER-11 |
Methodology for Qualification of in-Service Inspection Systems for WWER NPPs (former WWER-SC-123) (August 1997). |
|
| << | Versions | Index | C O N T E N T | Abbreviations | Comments | >> |